FR
Complete SystemsFM-200 Refilling & Gas Booster System (Complete)
Turnkey FM-200 / HFC-227ea cylinder refilling station — designed, built, installed and commissioned.
Request a quote
View details →
Charges nitrogen into the cylinder after FM-200 filling, up to the required pressure.
Once the FM-200 net weight is reached, the cylinder is super-pressurised with nitrogen to its required discharge pressure. This skid carries the nitrogen booster, regulation and isolation needed to do that repeatably, and to verify the final pressure.
| Stage | Step 6 — nitrogen pressurisation |
|---|---|
| Media | Nitrogen (N₂) |
| Function | Super-pressurisation to required cylinder pressure |
| Control | Regulated, with pressure gauge verification |
Prices exclude VAT and delivery. Volume discounts available.
Turnkey FM-200 / HFC-227ea cylinder refilling station — designed, built, installed and commissioned.
Increases FM-200 / HFC-227ea pressure for transfer and high-pressure cylinder filling.
Connects source cylinder, booster pump and receiving cylinder for safe gas transfer.